bridge-island-tunnel is the biggest control difficult. China Shipping And Ports Authority contract to build island-tunnel joint engineering,include one mega immersed tunnel,two artificial island,Sany participate in construction,and supply 12 units trailer pumps,10unit mixer trucks and 1 unit batching plant.
580Meters,Sany assit cap structure of Shanghai Tower.
The Wind Volcano on the Qinghai Tibet Plateau,altitude 5050Meters,it is one part of Qinghai-Tibet Railway,3 units Sany concrete pumps display their prowess fully here.
Beijing Winter Olympics,Sany 56Meters pump truck assit ski center construction located in 2198meters altitude Xiaohaituo Mountain.